Specialized provider of Maritime Solutions in the areas of Quality, Health, Safety, Environmental, Security and Risk Management.
25 Φεβρουαρίου, 2014 | Posted by admin in Χωρίς κατηγορία - (Δεν επιτρέπεται σχολιασμός στο Paris MOU – CIC preliminary results 2013)
The Paris MOU issued a press release stating that the preliminary results from the Concentrated Inspection Campaign (CIC) on Propulsion and Auxiliary Machinery, carried out between 1 September 2013 and 30 November 2013 in the Paris MoU region show that:
68 ships (41% of all detentions) were detained over the 3 month period as a direct result of the CIC for deficiencies related to propulsion and auxiliary machinery. Problem areas included the propulsion of the main engine, cleanliness of the engine room and emergency source of power/emergency generator.
cic, deficiencies, detention, PARIS MOU
31 Ιουλίου, 2013 | Posted by admin in Χωρίς κατηγορία - (Δεν επιτρέπεται σχολιασμός στο Concentrated Inspection Campaign (CIC) 2013 on propulsion and auxiliary machinery)
The Maritime Authorities of the Paris and the Tokyo Memoranda of Understanding (MoU) on Port State Control will launch a joint Concentrated Inspection Campaign (CIC) with the purpose to ensure compliance with SOLAS Chapter II-1 commencing from 1 September 2013 and ending on 30 November 2013.
The scope of the CIC is the safety of propulsion and auxiliary machinery, especially the working order and maintenance of the main engines, auxiliary engines, auxiliary equipment and their related alarm systems. Special attention will be given to familiarity of the crew with safety and emergency procedures with regard to these systems.The propulsion and machinery installations will be verified in more detail for compliance with the mentioned scope of the CIC during a regular Port State Control inspection conducted under the regional ship selection criteria within the Paris and Tokyo MoU regions.
Port State Control Officers (PSCOs) will use a list of 12 selected items to verify critical areas for the propulsion and auxiliary machinery installations, some of which are related to documentation, main and auxiliary equipment, crew familiarization and operational controls. For this purpose, PSCOs will apply a questionnaire listing a number of items to be covered during the concentrated inspection campaign. You can click here to download the questionnaire .
When deficiencies are found, actions by the port State may vary from recording a deficiency and instructing the master to rectify it within a certain period to detaining the ship until serious deficiencies have been rectified. In the case of detention, publication in the monthly detention lists of the Paris and Tokyo MoU web sites will take place. It is expected that the Paris and Tokyo MoUs will carry out approximately 10,000 inspections during the CIC.
cic, deficiencies, PARIS MOU, SOLAS, TOKYO MOU