Specialized provider of Maritime Solutions in the areas of Quality, Health, Safety, Environmental, Security and Risk Management.
25 Φεβρουαρίου, 2014 | Posted by admin in Χωρίς κατηγορία - (Δεν επιτρέπεται σχολιασμός στο Paris MOU – CIC preliminary results 2013)
The Paris MOU issued a press release stating that the preliminary results from the Concentrated Inspection Campaign (CIC) on Propulsion and Auxiliary Machinery, carried out between 1 September 2013 and 30 November 2013 in the Paris MoU region show that:
68 ships (41% of all detentions) were detained over the 3 month period as a direct result of the CIC for deficiencies related to propulsion and auxiliary machinery. Problem areas included the propulsion of the main engine, cleanliness of the engine room and emergency source of power/emergency generator.
cic, deficiencies, detention, PARIS MOU